Flooring Installation

LVP, laminate and tile, installed over a subfloor that has been checked and put right first. New floors, tear-out of old carpet and vinyl, and repairs where a floor has failed or taken water. We buy flooring overstock by the pallet, so on a lot of jobs the material comes in well under retail.

Flooring we have done

See all work
Bare plywood subfloor prepped for new flooring

Main floor, LVP and trim

Flooring · Garretson, SD
Dated dining room with built-in shelving before the remodel

Dining nook, floor + trim

Flooring · Garretson, SD
Vinyl plank flooring being installed in a living room

LVP going down, living room

Flooring · Garretson, SD
Dated living room with textured ceiling before the remodel

Full living room demo and remodel

Flooring · Garretson, SD
Old hardwood floor being stripped and cleaned

Original hardwood, stripped back

Flooring · Garretson, SD
Fresh plywood subfloor screwed down in a doorway

New plywood subfloor

Flooring · Garretson, SD
What that covers Free estimates

We work out of Garretson and cover about an hour in any direction: Garretson, Sioux Falls, Brandon, Dell Rapids, Baltic, Sherman, Harrisburg, Tea, Hartford and the towns between. See the areas we serve.

Common questions Ask us anything else
Do I have to buy the flooring from you?

No. We buy flooring overstock by the pallet when it comes up and pass the saving on, and we order direct when a job calls for something specific. If you would rather buy your own, we will fit it. The one thing to know is that we can only stand behind our own installation in that case, not the material: anything covered by the manufacturer is between you and them, and short orders or damaged boxes are on you to sort out.

Can you lay new flooring over what is already down?

Sometimes, and we go by the manufacturer instructions for whatever is going down, because ignoring them is what voids the material warranty. As a rule a floating floor cannot go over another floating floor. Over tile or hardwood it is often allowed if the old floor is sound and flat, though we usually still recommend pulling it up. Going over the top raises the finished height, and that has knock-on effects: transitions to the next room, doors that need taking off and trimming, baseboards, and appliances that no longer slide out from under a counter.

Do you move the furniture?

Usually yes, and it is in the quote. The exception is anything that genuinely needs more hands, a loaded gun safe or a 500 lb hutch being the usual culprits. If a job needs two more people on site to shift something, we bill for the time those two are there and we tell you before, not after.

How long does a room take?

An average room is a day once the site is prepped. What moves that is the prep rather than the laying: a subfloor that needs work, an old floor coming out, or furniture that has to go somewhere first.

What happens if the subfloor underneath is bad?

We check it before anything new goes down. Dips get filled and humps come down, and where we can get at the joists we screw and glue the subfloor so it does not squeak later. Sometimes that means new subfloor over the old one, and sometimes it means taking an old finished floor off to find out what caused the movement in the first place.

Got something that needs doing? Send photos and we will price it.

Call or text (605) 681-6789. Licensed and insured. Estimates are free, and we put the number in writing.