Work

Homeowner jobs and sub work, most recent first. 39 projects.

Bare plywood subfloor prepped for new flooring Before
Finished room with plank flooring and recessed lighting After

Main floor, LVP and trim

Flooring · Brandon, SD · 4 days
Dated dining room with built-in shelving before the remodel Before
Dining nook with new plank floor and iron chandelier After

Dining nook, floor + trim

Flooring · Brandon, SD
Vinyl plank flooring being installed down a hallway

LVP going down, hallway

Flooring · Brandon, SD
Dated living room with textured ceiling before the remodel Before
Finished living room with dark plank flooring After

Full living room demo and remodel

Flooring · Garretson, SD
Basement stone foundation corner before the platform was built Before
Framed wood platform and tools on a basement floor During
Washer and dryer set on a new raised plywood platform After

Laundry platform, built and set

Repair · Garretson, SD
Old plaster ceiling exposed after the drop tile came out Before
Ceiling stripped back to bare joists ready for new drywall During

Drop ceiling out, room raised

Demo · Dell Rapids, SD
Old flooring being pulled up in an empty room

Old floor, torn out

Demo · Dell Rapids, SD
Floor edge opened at the wall showing old wiring below

Floor edge opened at the wall

Demo · Dell Rapids, SD
New drywall ceiling with taped and mudded seams

New ceiling, taped and mudded

Drywall & paint · Luverne, MN
Hallway with taped ceiling seams and plastic over the floor

Hall ceiling, seams taped

Drywall & paint · Luverne, MN
Finished living room with painted walls and ceiling fan

Living room, painted out

Drywall & paint · Garretson, SD
Flatbed trailer loaded with strapped pallets of flooring

Flooring delivery, 24 ft flatbed

Hauling · Hudson, WI
Pickup towing a loaded gooseneck flatbed trailer

Gooseneck load, material run

Hauling · St. James, MN
Trailer loaded with brush, dirt, rock and junk Loaded
Trailer unloading at the landfill debris pile Gone

Cleanout haul, straight to the landfill

Hauling · Brandon and Harrisburg, SD
Pickup and flatbed trailer loaded with pallets of flooring

Flooring pallets, supplier run

Hauling · Gillette, WY
Tarped load strapped on a flatbed trailer at night

Late haul, tarped and strapped

Hauling · Bloomington, MN
Box truck and dumpster at a dock during an overstock load out

Overstock load out

Hauling · Huntington, AL
Trailer loaded with bundles of composite decking boards

Composite decking, picked up

Decks · Sioux Falls, SD
Trailer loaded with wrapped white PVC fence panels

PVC fence panels, picked up

Decks · Lincoln, NE
Cracked and peeling plaster wall corner Before
Patching compound skim-coated over the old texture During
Smooth painted wall after the plaster repair After

Cracked plaster, skimmed and painted

Repair · Garretson, SD
Worn brake rotor exposed with the caliper removed Before
Used brake pads removed during a brake service During

Brakes, rotors and pads

Repair · Shop
Diesel intake manifold removed showing carbon buildup

Diesel intake, cleaned and reset

Repair · Shop
Diesel engine bay during a disaster prevention kit install

Disaster prevention kit, installed

Repair · Shop
Rigid metal duct run out to the basement window
Rigid duct routed along the basement ceiling
New louvered vent set into the glass block window

Rigid dryer duct for a new washer and dryer spot

Repair · Garretson, SD
Guest room walls stripped of wallpaper and texture, patched Before
Guest room masked off and ready for paint During
Finished guest room with painted walls and restored wood floor After

Guest room, wallpaper peeled, texture removed, skim coated and painted

Drywall & paint · Garretson, SD
Drywall corner with joint compound patches and a vent opening

Patches and a new vent opening

Drywall & paint · Luverne, MN
Old hardwood floor being stripped and cleaned

Original hardwood, stripped back

Flooring · Luverne, MN
Fresh plywood subfloor screwed down in a doorway

New plywood subfloor

Flooring · Luverne, MN
Ceiling fan taken down and set aside during a remodel

Fixtures out before flooring

Demo · Brandon, SD
Base cabinets staged for a built-in bookshelf

Built-in bookshelf, base cabinets set

Repair · Garretson, SD
Pickup loaded with brush at the edge of a field

Brush and branch cleanout

Hauling · Garretson, SD
Pickup bed loaded with barrels and tools in a field

Site cleanout, barrels and tools

Hauling · Brandon, SD
Pickup and trailer with a tarped load on a driveway

Material drop

Hauling · Garretson, SD
Wrapped stacks of flooring strapped on a trailer

Flooring stock, strapped down

Hauling · Minneapolis, MN
Pickup truck loading material at the lumberyard

Material pickup, Menards

Hauling
White PVC fence panels strapped to a trailer

Fence panel bundle, strapped

Decks · Lincoln, NE
Old under-sink drain plumbing before the repair Before
New PVC trap and drain fitted under the sink After

Under-sink drain, replaced

Misc · Garretson, SD
Loaded trailer of fence panels at a fuel stop at night

Fence panels, night run home

Decks · Lincoln, NE
Wrapped flooring bundles strapped to a trailer at night

Flooring haul, loaded at night

Hauling

Have a job like one of these? Send photos.

Text is usually the fastest answer. Estimates are free.